Case Studies
Since 1923, CONCO has cleaned and tested over 100 million heat exchanger tubes for power generation customers worldwide. The following case studies represent but a few examples of how Conco technology produced extraordinary results for our valued customers.
-
PRODUCTION IN COLOMBIAN ETHANOL PLANT RISES CONSIDERABLY AFTER CONCO CLEANING TYPE OF PLANT: Ethanol production plant COUNTRY: Colombia CLEANING DATE: March, 2014 NUMBER OF HEAT EXCHANGERS: 2 NUMBER OF TUBES: A: 643 tubes, B: 343 tubes DIAMETER: 3/4 “ BWG: 12 LENGTH: 4000 mm MATERIAL: Stainless Steel TYPE OF CLEANING: Mechanic
-
Conco Technology Reduces Heat Exchanger Cleaning Time by 60% at Colombian Refinery Industry: Petroleum Refining
-
Conco Crew, Armed with HydroDrill and Positive Attitude, Clears Over 1,300 Severely Blocked Tubes at Florida Plant Sector: Agriculture
The Mosaic Company is the world’s largest combined producer of phosphate and potash, and has more than 12,000 people working to serve agricultural customers in approximately 40 countries worldwide. -
Conco technology considerably improves quality and saves time on cleaning at Argentine Thermal Power Plant followed by Eddy Current Test. The electricity sector in Argentina is the third largest electricity market in Latin America, behind Brazil and Mexico, and is the 31st in the world. The matrix of Argentina depends primarily on fossil fueled power plantas (approximately 63% in 2019). For this reason...